Linear Cut Planner · offline companion 1.6.0

Open the companion guide in a new tab

Compare two plans for the same cutting job.

Load one original input and two complete reports. Both plans must pass the same numerical geometry contract before any score, inventory or offcut difference is shown.

The stated objective first minimizes total raw stock length, then bar count at that length. Prices, physical measurements and realized savings are not assessed. A lower feasible score refutes the other plan being optimal; it does not prove the preferred plan globally best.

1. Choose the same original input

Which run files do I need? (opens in a new tab) Read the local file guide before selecting input, reports or exports.

Supported complete report schema 1.1, tool versions 1.1.4–1.1.7, common end allowances. Up to 500 parts and 20 stock rows. This page does not convert units, merge jobs, reorder part identities or support future contracts. Keep the original planner input; a report alone is insufficient.

Plan A
Plan B

Files stay local. UTF-8 text only, at most 2 MiB each. An optional CSV must match its own report; a mismatched supplied export blocks comparison. With no CSV supplied, CSV agreement remains unassessed.

Choose the original input and both complete reports.